Projects • Case Study
Spacious & Stylish: Kitchen Renovation in Milton with Structural Wall Removal
Our clients in Milton wanted a brighter, more functional kitchen. By removing a structural wall and incorporating custom finishes, we gave them the dream space they always envisioned—affordable, elegant, and full of storage.
Renovation Type:
Kitchen & Main Floor Renovation
Location:
Milton, Ontario
Timeline:
3 Weeks
Client Goal:
Create an open-concept layout with custom storage and a high-end feel
Gallery
Cramped Kitchen, Narrow Layout, and Minimal Storage
The original kitchen felt closed off from the rest of the main floor. With tight walkways and limited countertop space, the homeowners dreamed of an open, functional kitchen. We identified the load-bearing wall that divided the kitchen and living area—and once permits were secured, we removed it to completely open up the space.
01
Structural Wall Removal (with permit)
02
New Kitchen Layout & Cabinetry
03
Built-in Appliance Garage
04
Custom Spice Rack & Functional Drawers
05
Quartz Countertop & Full Backsplash
06
Flooring, Potlights & Fresh Paint (Main Floor)
work
Scope Of Work
Unique Challenge
Cramped Kitchen, Narrow Layout, and Minimal Storage
The original kitchen felt closed off from the rest of the main floor. With tight walkways and limited countertop space, the homeowners dreamed of an open, functional kitchen. We identified the load-bearing wall that divided the kitchen and living area—and once permits were secured, we removed it to completely open up the space.
Unique Challenge
Cramped Kitchen, Narrow Layout, and Minimal Storage
The original kitchen felt closed off from the rest of the main floor. With tight walkways and limited countertop space, the homeowners dreamed of an open, functional kitchen. We identified the load-bearing wall that divided the kitchen and living area—and once permits were secured, we removed it to completely open up the space.
3D Design
Built Around the Client’s Wishlist
From our first walk-through, we worked closely with Sandra and David to bring their vision to life. They shared inspiration from Pinterest and high-end designer kitchens—and we delivered on every one of their requests. Custom cabinetry, a concealed appliance garage, specialized utensil drawers, and elegant finishes all came together to meet their exact style and storage needs.
Construction timeline
From Closed Off to Wide Open in 3 Weeks
1
week
Permit approval, demolition, and structural wall removal
2
week
Framing, electrical setup, new cabinet installation, and flooring
3
week
Appliance garage and drawer inserts added, quartz countertop and backsplash installed, custom crown molding completed
4
week
Potlights, final painting, and finishing touches throughout the main floor
qualities
Key Features
Structural Wall Removal
For open-concept design
Double Shaker Cabinets
With soft-closing drawers
Quartz Countertop & Printed Full Backsplash
For a luxury look
Built-In Appliance Garage
For seamless storage
Custom Spice Rack & Utensil Drawers
Based on client wish list
Fresh Flooring & Potlights
To brighten the main floor
Crown Molding & Paint
For a cohesive finish
Testimonial
Our Customer
Says...
Everything We Dreamed Of—And More!
“From the quote to the final finishes, everything was amazing. The team was always responsive and made every Pinterest idea we shared a reality. The space feels luxurious, open, and was completed at an affordable price. Everyone who visits is blown away!”
— Sandra & David, Homeowners
Want to open up your space like this Milton kitchen?
Contact us today to schedule your consultation or click the link in our bio to get started.
